The brief...
We have been commissioned to film the construction progress of X1 Michigan Towers, an iconic new development in the centre of MediaCityUK. Building on the success of X1 Media City, the towers form part of a growing waterside neighbourhood connected to the wider Manchester region through the nearby Metrolink
Filming takes place every eight weeks to document the progression of the development. Each visit combines aerial drone footage with interior construction shots, capturing key stages of the build and activity across the site. Notes provided by the X1 team guide the filming, allowing us to target specific areas and milestones during each visit
The result...
Using the 70mm drone lens, we are also able to capture close detail of structural works higher up the building, giving a clearer view of progress on the façade and other construction elements. Interior shots document the ongoing work inside the building, while notes from the X1 team are overlaid onto the relevant scenes to highlight key milestones across the site. The videos are shared on the X1 Developments official YouTube and LinkedIn pages, keeping investors and the wider audience informed as the project progresses
Behind the lens...
Inside the building we film using a Lumix full frame camera paired with a 24-70mm lens, mounted on a DJI Ronin gimbal for stable movement through the construction floors. A Rode microphone is attached to capture any on-site audio when required. By returning to the site every eight weeks, we create a consistent visual record of the build as the towers continue to rise within the MediaCity and Manchester skyline